The Space Shuttle Columbia arrives at Launch Pad 39B following an approximately seven-hour journey from the Vehicle Assembly Building (VAB). Columbia is being prepared for a targeted February 22 liftoff on Mission STS-75, which will feature a re- flight of the Tethered Satellite System (TSS-1R) and the third flight of the U.S. Microgravity Payload (USMP-3).
Information
Taken in
Kennedy Space Center
Author
NASA
Description
The Space Shuttle Columbia arrives at Launch Pad 39B following an approximately seven-hour journey from the Vehicle Assembly Building (VAB). Columbia is being prepared for a targeted February 22 liftoff on Mission STS-75, which will feature a re- flight of the Tethered Satellite System (TSS-1R) and the third flight of the U.S. Microgravity Payload (USMP-3).