KSC-02PD-0647.jpg KSC-02PD-0646ThumbnailsSTS111-315-010KSC-02PD-0646ThumbnailsSTS111-315-010
At Pad 39A, technicians install the replacement wrist joint for the Space Station Remote Manipulator System into Space Shuttle Endeavour's payload bay. The new wrist joint, called an Orbital Replacement Unit (ORU), will be installed next to the arm's Latching End Effector during the final of three planned spacewalks. Mission STS-111 is designated UF-2, the 14th assembly flight to the International Space Station. Endeavour's payload includes the Multi-Purpose Logistics Module Leonardo and Mobile Base System. The mission also will swap resident crews on the Station, carrying the Expedition 5 crew and returning to Earth Expedition 4. Liftoff of Endeavour is scheduled between 4 and 8 p.m. May 30, 2002
Information
Taken in
Kennedy Space Center
Author
NASA
Description
At Pad 39A, technicians install the replacement wrist joint for the Space Station Remote Manipulator System into Space Shuttle Endeavour's payload bay. The new wrist joint, called an Orbital Replacement Unit (ORU), will be installed next to the arm's Latching End Effector during the final of three planned spacewalks. Mission STS-111 is designated UF-2, the 14th assembly flight to the International Space Station. Endeavour's payload includes the Multi-Purpose Logistics Module Leonardo and Mobile Base System. The mission also will swap resident crews on the Station, carrying the Expedition 5 crew and returning to Earth Expedition 4. Liftoff of Endeavour is scheduled between 4 and 8 p.m. May 30, 2002
Source link
https://images.nasa.gov/search?q=STS-111&page=5&media=image,video,audio&yearStart=1920&yearEnd=2024
Visits
129
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
Public Domain
Modified by WikiArchives
No (original)
Downloads
3
EXIF Metadata
DateTimeOriginal
2002:05:08 00:00:00