KSC-01PP-0022.jpg KSC-01PP-0021ThumbnailsKSC-01PP-0023KSC-01PP-0021ThumbnailsKSC-01PP-0023
STS-98 Pilot Mark Polansky is pleased to arrive at KSC’s Shuttle Landing Facility for Terminal Countdown Test Activities. In preparation for the Jan. 19 launch, he and the rest of the crew – Commander Ken Cockrell and Mission Specialists Robert Curbeam, Thomas Jones and Marsha Ivins – will be training in emergency procedures from the pad, checking the payload and taking part in a simulated countdown. The payload for the mission is the U.S. Lab Destiny, a key element in the construction of the International Space Station. The lab has five system racks already installed inside the module. After delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated. STS-98 is the seventh construction flight to the ISS.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
STS-98 Pilot Mark Polansky is pleased to arrive at KSC’s Shuttle Landing Facility for Terminal Countdown Test Activities. In preparation for the Jan. 19 launch, he and the rest of the crew – Commander Ken Cockrell and Mission Specialists Robert Curbeam, Thomas Jones and Marsha Ivins – will be training in emergency procedures from the pad, checking the payload and taking part in a simulated countdown. The payload for the mission is the U.S. Lab Destiny, a key element in the construction of the International Space Station. The lab has five system racks already installed inside the module. After delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated. STS-98 is the seventh construction flight to the ISS.
Source link
https://science.ksc.nasa.gov/gallery/photos/2001/captions/
Visits
72
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC
Modified by WikiArchives
No (original)
Downloads
0