KSC-01PP-0138.jpg KSC-01PP-0139VirschäibillerKSC-01PP-0137KSC-01PP-0139VirschäibillerKSC-01PP-0137
From across the turn basin can be seen Space Shuttle Atlantis approaching the Vehicle Assembly Building (at left). Atlantis is rolling back to the VAB from Launch Pad 39A. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6.
Information
Taken in
Kennedy Space Center
Auteur
NASA
Description
From across the turn basin can be seen Space Shuttle Atlantis approaching the Vehicle Assembly Building (at left). Atlantis is rolling back to the VAB from Launch Pad 39A. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6.
Erstallt den
Freiden 19 Januar 2001
Source link
https://science.ksc.nasa.gov/gallery/photos/2001/captions/
Visitten
91
Location
View on OpenStreetMap
Bewäertungs-Stand
nach keng Bewäertung
Foto bewäerten
License
CC BY-NC
Modified by WikiArchives
No (original)
Downloads
0