KSC-01PP-0147.jpg KSC-01PP-0146ThumbnailsKSC-01PP-0148KSC-01PP-0146ThumbnailsKSC-01PP-0148
Near the bottom of the solid rocket booster in the Vehicle Assembly Building, a United Space Alliance SRB technician detaches the SRB system tunnel cover on the 36 cables inside. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
Near the bottom of the solid rocket booster in the Vehicle Assembly Building, a United Space Alliance SRB technician detaches the SRB system tunnel cover on the 36 cables inside. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6.
Source link
https://science.ksc.nasa.gov/gallery/photos/2001/captions/
Visits
85
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC
Modified by WikiArchives
No (original)
Downloads
0