Mission: Commercial Communications Satellites (ANIK C-3)/Satellite Business Systems (SBS-C)
Space Shuttle: Columbia
Launch Pad: 39A
Launched: Nov. 11, 1982 at 7:19:00 a.m. EST
Landing Site: Edwards Air Force Base, Calif.
Landing: Nov. 16, 1982 at 6:33:26 a.m. PST
Runway: 22
Rollout Distance: 9,553 feet
Rollout Time: 63 seconds
Revolution: 82
Mission Duration: 5 days, 2 hours, 14 minutes and 26 seconds
Returned to KSC: Nov. 22, 1982
Orbit Altitude: 184 nautical miles
Orbit Inclination: 28.5 degrees
Miles Traveled: 2.1 million

Crew Members

Commander Vance D. Brand, Pilot Robert F. Overmyer and Mission Specialists Joseph P. Allen and William B. Lenoir.

Mission Highlights

This first shuttle operational mission deployed two commercial communications satellites, ANIK C-3 for TELESAT Canada and SitS-C for Satellite Business Systems. Each satellite was equipped with a Payload Assist Module-D (PAM-D) solid rocket motor, which fired about 45 minutes after deployment, placing each satellite into a highly elliptical orbit. One Get Away Special and three Shuttle Student Involvement Program (SSIP) experiments were conducted. The first scheduled space walk of the shuttle program was canceled due to a malfunction of the space suit.
Mission Photos (Original)
Post Flight
Videos
Documents