KSC-99PP-0564.jpg KSC-99PP-0563ThumbnailsKSC-99PP-0565KSC-99PP-0563ThumbnailsKSC-99PP-0565
Nearing the end of its 4.2-mile trek from the Vehicle Assembly Building (VAB), Space Shuttle Discovery clears the gate to begin the climb to Launch Pad 39B aboard the mobile launcher platform and crawler transporter. Earlier in the week, the Shuttle was rolled back to the VAB from the pad to repair hail damage on the external tank's foam insulation. Mission STS-96, the 94th launch in the Space Shuttle Program, is scheduled for liftoff May 27 at 6:48 a.m. EDT. STS-96 is a logistics and resupply mission for the International Space Station, carrying such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-shared experiment.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
Nearing the end of its 4.2-mile trek from the Vehicle Assembly Building (VAB), Space Shuttle Discovery clears the gate to begin the climb to Launch Pad 39B aboard the mobile launcher platform and crawler transporter. Earlier in the week, the Shuttle was rolled back to the VAB from the pad to repair hail damage on the external tank's foam insulation. Mission STS-96, the 94th launch in the Space Shuttle Program, is scheduled for liftoff May 27 at 6:48 a.m. EDT. STS-96 is a logistics and resupply mission for the International Space Station, carrying such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-shared experiment.
Source link
https://science.ksc.nasa.gov/gallery/photos/1999/
Visits
29
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
1