KSC-99PP-1165.jpg ThumbnailsKSC-99PP-1166ThumbnailsKSC-99PP-1166
A short during liftoff of Space Shuttle Columbia in July was traced to a wire in the payload bay with damaged insulation. As a result of that problem, NASA decided to inspect much of the wiring in all four Space Shuttles and make repairs as required. Here a technician is examining the wires onboard orbiter Endeavour. The next Shuttle mission, STS-103, the Third Hubble Space Telescope Servicing Mission, is currently scheduled for launch no earlier than Nov. 19, 1999.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
A short during liftoff of Space Shuttle Columbia in July was traced to a wire in the payload bay with damaged insulation. As a result of that problem, NASA decided to inspect much of the wiring in all four Space Shuttles and make repairs as required. Here a technician is examining the wires onboard orbiter Endeavour. The next Shuttle mission, STS-103, the Third Hubble Space Telescope Servicing Mission, is currently scheduled for launch no earlier than Nov. 19, 1999.
Source link
https://science.ksc.nasa.gov/gallery/photos/1999/
Visits
45
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0