KSC-08PD-2489.jpg KSC-08PD-2501MiniaturebillederKSC-08PD-2495KSC-08PD-2501MiniaturebillederKSC-08PD-2495
In the Vehicle Assembly Building transfer aisle at NASA's Kennedy Space Center, the overhead crane lifts space shuttle Atlantis high above its transporter. Atlantis will be raised to vertical for transfer to high bay 3. There it will be stacked with its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for 1:34 a.m. EDT Oct. 8.
Information
Taken in
Kennedy Space Center
Forfatter
NASA/Dimitri Gerondidakis
Beskrivelse
In the Vehicle Assembly Building transfer aisle at NASA's Kennedy Space Center, the overhead crane lifts space shuttle Atlantis high above its transporter. Atlantis will be raised to vertical for transfer to high bay 3. There it will be stacked with its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for 1:34 a.m. EDT Oct. 8.
Oprettet den
Lørdag 23 August 2008
Source link
https://images.nasa.gov/search-results?q=STS-125&page=16&media=image&yearStart=2008&yearEnd=2010
Besøg
43
Location
Vis i OpenStreetMap
Bedømmelse
ingen bedømmelse
Bedøm dette fotografi
License
Public Domain
Modified by WikiArchives
No (original)
Downloads
0
EXIF-metadata
DateTimeOriginal
2008:08:23 00:00:00