KSC-08PD-3273.jpg KSC-08PD-3269ThumbnailsKSC-08PD-3276KSC-08PD-3269ThumbnailsKSC-08PD-3276
Space shuttle Atlantis (right) rolls toward the Vehicle Assembly Building (far left) via the crawlerway at NASA's Kennedy Space Center in Florida after rolling back from Launch Pad 39A. In the VAB, Atlantis will await launch on its STS-125 mission to repair NASA's Hubble Space Telescope. Between them is the Pegasus barge in the turn basin. First motion of Atlantis off the pad was at 6:48 a.m. EDT. The journey was expected to take about six hours. Atlantis' targeted launch on Oct. 14 was delayed when a system that transfers science data from the orbiting observatory to Earth malfunctioned on Sept. 27. The new target launch date is under review.
Information
Taken in
Kennedy Space Center
Author
NASA/Kim Shiflett
Description
Space shuttle Atlantis (right) rolls toward the Vehicle Assembly Building (far left) via the crawlerway at NASA's Kennedy Space Center in Florida after rolling back from Launch Pad 39A. In the VAB, Atlantis will await launch on its STS-125 mission to repair NASA's Hubble Space Telescope. Between them is the Pegasus barge in the turn basin. First motion of Atlantis off the pad was at 6:48 a.m. EDT. The journey was expected to take about six hours. Atlantis' targeted launch on Oct. 14 was delayed when a system that transfers science data from the orbiting observatory to Earth malfunctioned on Sept. 27. The new target launch date is under review.
Source link
https://images.nasa.gov/search-results?q=STS-125&page=19&media=image&yearStart=2008&yearEnd=2010
Visits
37
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
Public Domain
Modified by WikiArchives
No (original)
Downloads
0
EXIF Metadata
DateTimeOriginal
2008:10:20 00:00:00