KSC-05PD-1247.jpg MiniaturoKSC-05PD-1248MiniaturoKSC-05PD-1248
In the transfer aisle of the Vehicle Assembly Building, orbiter Discovery hangs suspended in a vertical position. It will be lifted over a cross-beam into high bay 3 and remated with the new External Tank, ET-121, and Solid Rocket Boosters in the bay. That tank was originally scheduled to fly with Atlantis on the second Return to Flight mission, STS-121. A new heater was added to the tank's feedline bellows, part of the pipeline that carries the liquid oxygen to the orbiters main engines, to minimize the potential for ice and frost buildup. After the remate, technicians will work final closeouts on the fully assembled Space Shuttle stack, and perform liquid oxygen and liquid hydrogen electrical mates and an interface verification test. Discovery is currently scheduled to return to Launch Pad 39B on June 13.
Information
Taken in
Kennedy Space Center
Aŭtoro
NASA
Priskribo
In the transfer aisle of the Vehicle Assembly Building, orbiter Discovery hangs suspended in a vertical position. It will be lifted over a cross-beam into high bay 3 and remated with the new External Tank, ET-121, and Solid Rocket Boosters in the bay. That tank was originally scheduled to fly with Atlantis on the second Return to Flight mission, STS-121. A new heater was added to the tank's feedline bellows, part of the pipeline that carries the liquid oxygen to the orbiters main engines, to minimize the potential for ice and frost buildup. After the remate, technicians will work final closeouts on the fully assembled Space Shuttle stack, and perform liquid oxygen and liquid hydrogen electrical mates and an interface verification test. Discovery is currently scheduled to return to Launch Pad 39B on June 13.
Kreita je la
Mardo 7 Junio 2005
Source link
https://science.ksc.nasa.gov/gallery/photos/2005/
Vizitoj
36
Location
View on OpenStreetMap
Poento
neniu taksado
Taksu tiun foton
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Elŝutadoj
0