KSC-05PD-1753.jpg KSC-05PD-1752ThumbnailsKSC-05PD-1754KSC-05PD-1752ThumbnailsKSC-05PD-1754
STS114-S-024 - The silvery surface of this pond near NASA Kennedy Space Centers Launch Pad 39B reflects the glowing clouds of smoke and steam from the launch of Space Shuttle Discovery on Return to Flight mission STS-114. Liftoff occurred at 10:39 a.m. EDT. On this mission to the International Space Station the crew will perform inspections on-orbit for the first time of all of the Reinforced Carbon-Carbon (RCC) panels on the leading edge of the wings and the Thermal Protection System tiles using the new Canadian-built Orbiter Boom Sensor System and the data from 176 impact and temperature sensors. Mission Specialists will also practice repair techniques on RCC and tile samples during a spacewalk in the payload bay. During two additional spacewalks, the crew will install the External Stowage Platform-2, equipped with spare part assemblies, and a replacement Control Moment Gyroscope contained in the Lightweight Multi-Purpose Experiment Support Structure. The 12-day mission is expected to end with touchdown at the Shuttle Landing Facility on Aug. 7.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
STS114-S-024 - The silvery surface of this pond near NASA Kennedy Space Centers Launch Pad 39B reflects the glowing clouds of smoke and steam from the launch of Space Shuttle Discovery on Return to Flight mission STS-114. Liftoff occurred at 10:39 a.m. EDT. On this mission to the International Space Station the crew will perform inspections on-orbit for the first time of all of the Reinforced Carbon-Carbon (RCC) panels on the leading edge of the wings and the Thermal Protection System tiles using the new Canadian-built Orbiter Boom Sensor System and the data from 176 impact and temperature sensors. Mission Specialists will also practice repair techniques on RCC and tile samples during a spacewalk in the payload bay. During two additional spacewalks, the crew will install the External Stowage Platform-2, equipped with spare part assemblies, and a replacement Control Moment Gyroscope contained in the Lightweight Multi-Purpose Experiment Support Structure. The 12-day mission is expected to end with touchdown at the Shuttle Landing Facility on Aug. 7.
Source link
https://science.ksc.nasa.gov/gallery/photos/2005/
Visits
46
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0