KSC-04PD-1852.jpg KSC-04PD-1850DiapositibakKSC-04PD-1851KSC-04PD-1850DiapositibakKSC-04PD-1851
Looking at damage on the second floor of the hurricane-ravaged Thermal Protection System Facility (TPSF) are (from left) Kevin Harrington, manager of Soft Goods Production, TPSF ; Martin Wilson, manager of Thermal Protection System operations for USA; Scott Kerr, KSC director of Spaceport Services; and James Kennedy, Center director. The TPSF, which creates the TPS tiles, blankets and all the internal thermal control systems for the Space Shuttles, is almost totally unserviceable at this time after losing approximately 35 percent of its roof during Hurricane Frances, which blew across Central Florida Sept. 4-5. Undamaged equipment was removed from the TPSF and stored in the RLV hangar. NASA Administrator Sean OKeefe and NASA Associate Administrator of Space Operations Mission Directorate William Readdy are visiting KSC to survey the damage sustained by KSC facilities from the hurricane. The Labor Day storm also caused significant damage to the Vehicle Assembly Building and Processing Control Center. Additionally, the Operations and Checkout Building, Vertical Processing Facility, Hangar AE, Hangar S and Hangar AF Small Parts Facility each received substantial damage. However, well-protected and unharmed were NASAs three Space Shuttle orbiters Discovery, Atlantis and Endeavour along with the Shuttle launch pads, all of the critical flight hardware for the orbiters and the International Space Station, and NASAs Swift spacecraft that is awaiting launch in October.
Information
Taken in
Kennedy Space Center
Egilea
NASA
Azalpena
Looking at damage on the second floor of the hurricane-ravaged Thermal Protection System Facility (TPSF) are (from left) Kevin Harrington, manager of Soft Goods Production, TPSF ; Martin Wilson, manager of Thermal Protection System operations for USA; Scott Kerr, KSC director of Spaceport Services; and James Kennedy, Center director. The TPSF, which creates the TPS tiles, blankets and all the internal thermal control systems for the Space Shuttles, is almost totally unserviceable at this time after losing approximately 35 percent of its roof during Hurricane Frances, which blew across Central Florida Sept. 4-5. Undamaged equipment was removed from the TPSF and stored in the RLV hangar. NASA Administrator Sean OKeefe and NASA Associate Administrator of Space Operations Mission Directorate William Readdy are visiting KSC to survey the damage sustained by KSC facilities from the hurricane. The Labor Day storm also caused significant damage to the Vehicle Assembly Building and Processing Control Center. Additionally, the Operations and Checkout Building, Vertical Processing Facility, Hangar AE, Hangar S and Hangar AF Small Parts Facility each received substantial damage. However, well-protected and unharmed were NASAs three Space Shuttle orbiters Discovery, Atlantis and Endeavour along with the Shuttle launch pads, all of the critical flight hardware for the orbiters and the International Space Station, and NASAs Swift spacecraft that is awaiting launch in October.
Source link
https://science.ksc.nasa.gov/gallery/photos/2004/captions/
Bisitak
31
Location
View on OpenStreetMap
Kalifikazioa
baloratu gabe
Balioestea
License
Public Domain
Modified by WikiArchives
No (original)
Deskargak
0