KSC-20190702-PH-KLS02-0026.jpg KSC-20190702-PH-KLS02-0024ThumbnailsKSC-20190702-PH-KLS02-0039KSC-20190702-PH-KLS02-0024ThumbnailsKSC-20190702-PH-KLS02-0039
NASA’s Exploration Ground Systems conducts a water flow test with the mobile launcher at Kennedy Space Center’s Pad 39B in Florida on July 2, 2019. It is the first of nine tests to verify the sound suppression system is ready for launch of NASA’s Space Launch System for the first Artemis mission. During launch, 400,000 gallons of water will rush onto the pad to help protect the rocket, NASA’s Orion Spacecraft, mobile launcher, and launch pad from the extreme acoustic and temperature environment.
Information
Taken in
Kennedy Space Center
Author
NASA/Kim Shiflett
Description
NASA’s Exploration Ground Systems conducts a water flow test with the mobile launcher at Kennedy Space Center’s Pad 39B in Florida on July 2, 2019. It is the first of nine tests to verify the sound suppression system is ready for launch of NASA’s Space Launch System for the first Artemis mission. During launch, 400,000 gallons of water will rush onto the pad to help protect the rocket, NASA’s Orion Spacecraft, mobile launcher, and launch pad from the extreme acoustic and temperature environment.
Created on
Tuesday 2 July 2019
Source link
https://www.flickr.com/photos/nasakennedy/albums/72157664052441771
Visits
39
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
Public Domain
Modified by WikiArchives
No (original)
Downloads
2
EXIF Metadata
Canon Canon EOS 5D Mark IV
Make
Canon
Model
Canon EOS 5D Mark IV
DateTimeOriginal
2019:07:02 11:07:43
ApertureFNumber
f/8.0