KSC-98PC-0356.jpg KSC-98PC-0355ThumbnailsKSC-98PC-0357KSC-98PC-0355ThumbnailsKSC-98PC-0357KSC-98PC-0355ThumbnailsKSC-98PC-0357KSC-98PC-0355ThumbnailsKSC-98PC-0357
Node 1, the first element for the International Space Station, and attached Pressurized Mating Adapter-1 continue with prelaunch preparation activities at KSC's Space Station Processing Facility. Node 1 is a connecting passageway to the living and working areas of the space station. The node is seen here being moved into the Shuttle payload transportation canister, where the doors will be closed for a two-week leak check. The node was moved to the canister from the element rotation stand, or test stand, where it underwent an interim weight and center of gravity determination. The final determination is planned to be performed prior to transporting Node 1 to the launch pad. Node 1 is scheduled to fly on STS-88.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
Node 1, the first element for the International Space Station, and attached Pressurized Mating Adapter-1 continue with prelaunch preparation activities at KSC's Space Station Processing Facility. Node 1 is a connecting passageway to the living and working areas of the space station. The node is seen here being moved into the Shuttle payload transportation canister, where the doors will be closed for a two-week leak check. The node was moved to the canister from the element rotation stand, or test stand, where it underwent an interim weight and center of gravity determination. The final determination is planned to be performed prior to transporting Node 1 to the launch pad. Node 1 is scheduled to fly on STS-88.
Source link
https://science.ksc.nasa.gov/gallery/photos/1998/captions/KSC-98PC-0356.html
Visits
76
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC
Modified by WikiArchives
No (original)
Downloads
1