KSC-00PP-1334.jpg KSC-00PP-1333Küçük resimlerKSC-00PP-1335KSC-00PP-1333Küçük resimlerKSC-00PP-1335
During pre-pack and fit check in the Operations and Checkout Building, STS-92 Mission Specialist Koichi Wakata of Japan looks over the equipment he will be wearing during launch and entry, such as the helmet and gloves on the table. Wakata and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities. The TCDT provides emergency egress training, simulated countdown exercises and opportunities to inspect the mission payload. This mission will be Wakata's second Shuttle flight. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT from Launch Pad 39A on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program.
Information
Taken in
Kennedy Space Center
Yayımcı
NASA
Tanım/Açıklama
During pre-pack and fit check in the Operations and Checkout Building, STS-92 Mission Specialist Koichi Wakata of Japan looks over the equipment he will be wearing during launch and entry, such as the helmet and gloves on the table. Wakata and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities. The TCDT provides emergency egress training, simulated countdown exercises and opportunities to inspect the mission payload. This mission will be Wakata's second Shuttle flight. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT from Launch Pad 39A on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program.
Source link
https://science.ksc.nasa.gov/gallery/photos/2000/
Görüntülenme
27
Location
OpenStreetMap Görünümü
Oy sayısı
puan verilmemiş
Bu fotoğrafa puan ver
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
İndirmeler
0