KSC-00PP-1482.jpg KSC-00PP-1481ThumbnailsKSC-00PP-1483KSC-00PP-1481ThumbnailsKSC-00PP-1483
The open doors of Space Shuttle Discovery's payload bay show the two elements to be added to the International Space Station on mission STS-92. At top is the third Pressurized Mating Adapter; below it is Integrated Truss Structure Z-1, the cornerstone truss of the Station. Making the 100th Space Shuttle mission launched from Kennedy Space Center, Discovery also will be making its 28th flight into space. On the 11-day mission, the crew of seven will be making four space walks to attach the hardware to the Station. l Space Station. The payload also includes the Integrated Truss Structure Z-1. During the 11-day mission, four extravehicular activities (EVAs), or space walks, are planned.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
The open doors of Space Shuttle Discovery's payload bay show the two elements to be added to the International Space Station on mission STS-92. At top is the third Pressurized Mating Adapter; below it is Integrated Truss Structure Z-1, the cornerstone truss of the Station. Making the 100th Space Shuttle mission launched from Kennedy Space Center, Discovery also will be making its 28th flight into space. On the 11-day mission, the crew of seven will be making four space walks to attach the hardware to the Station. l Space Station. The payload also includes the Integrated Truss Structure Z-1. During the 11-day mission, four extravehicular activities (EVAs), or space walks, are planned.
Source link
https://science.ksc.nasa.gov/gallery/photos/2000/
Visits
28
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0