KSC-01PP-0133.jpg KSC-01PP-0132ThumbnailsKSC-01PP-0134KSC-01PP-0132ThumbnailsKSC-01PP-0134
Space Shuttle Atlantis is ready to roll back to the Vehicle Assembly Building via the crawler-transporter. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
Space Shuttle Atlantis is ready to roll back to the Vehicle Assembly Building via the crawler-transporter. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6.
Source link
https://science.ksc.nasa.gov/gallery/photos/2001/captions/
Visits
95
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC
Modified by WikiArchives
No (original)
Downloads
0