KSC-2009-3324.jpg KSC-2009-3323缩略图KSC-2009-3325KSC-2009-3323缩略图KSC-2009-3325
As the sun rises over NASA's Kennedy Space Center in Florida, space shuttle Endeavour is half way on its 3.4-mile rollaround from Launch Pad 39B to Launch Pad 39A. First motion was at 3:16 a.m. EDT. Endeavour was on standby on Pad 39B to be used in the unlikely event that a rescue mission was necessary during space shuttle Atlantis' STS-125 mission to NASA's Hubble Space Telescope. The payload on the STS-127 mission includes the Japan Aerospace Exploration Agency's Kibo Exposed Facility and the Experiment Logistics Module Exposed Section of the International Space Station. They will be installed on the Kibo laboratory already on the station. Launch of STS-127 is targeted for June 13.
Information
Taken in
Kennedy Space Center
作者
NASA/Kim Shiflett
描述
As the sun rises over NASA's Kennedy Space Center in Florida, space shuttle Endeavour is half way on its 3.4-mile rollaround from Launch Pad 39B to Launch Pad 39A. First motion was at 3:16 a.m. EDT. Endeavour was on standby on Pad 39B to be used in the unlikely event that a rescue mission was necessary during space shuttle Atlantis' STS-125 mission to NASA's Hubble Space Telescope. The payload on the STS-127 mission includes the Japan Aerospace Exploration Agency's Kibo Exposed Facility and the Experiment Logistics Module Exposed Section of the International Space Station. They will be installed on the Kibo laboratory already on the station. Launch of STS-127 is targeted for June 13.
Source link
https://images.nasa.gov/search-results?q=STS-125&page=15&media=image&yearStart=2008&yearEnd=2010
访问量
44
Location
在 OpenStreetMap 查看
评价得分
没有评分
评分
License
Public Domain
Modified by WikiArchives
No (original)
下载
0
EXIF 元数据
DateTimeOriginal
2009:05:31 00:00:00