KSC-03PD-1805.jpg KSC-03PD-1804ThumbnailsKSC-03PD-1806KSC-03PD-1804ThumbnailsKSC-03PD-1806KSC-03PD-1804ThumbnailsKSC-03PD-1806KSC-03PD-1804ThumbnailsKSC-03PD-1806
At Port Canaveral, the Pressurized Module of the Japanese Experiment Module (JEM) is lifted out of the ships cargo hold. The container transport ship carrying JEM departed May 2 from Yokohama Harbor in Japan for the voyage to the United States. The National Space Development Agency of Japan (NASDA) developed the laboratory at the Tsukuba Space Center near Tokyo. The Pressurized Module is the first element of the JEM, named "Kibo" (Hope), to be delivered to KSC. The JEM is Japan's primary contribution to the Station. It will enhance the unique research capabilities of the orbiting complex by providing an additional environment for astronauts to conduct science experiments. The JEM also includes an exposed facility (platform) for space environment experiments, a robotic manipulator system, and two logistics modules. The various JEM components will be assembled in space over the course of three Shuttle missions. ch day during the launch period that closes on June 19.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
At Port Canaveral, the Pressurized Module of the Japanese Experiment Module (JEM) is lifted out of the ships cargo hold. The container transport ship carrying JEM departed May 2 from Yokohama Harbor in Japan for the voyage to the United States. The National Space Development Agency of Japan (NASDA) developed the laboratory at the Tsukuba Space Center near Tokyo. The Pressurized Module is the first element of the JEM, named "Kibo" (Hope), to be delivered to KSC. The JEM is Japan's primary contribution to the Station. It will enhance the unique research capabilities of the orbiting complex by providing an additional environment for astronauts to conduct science experiments. The JEM also includes an exposed facility (platform) for space environment experiments, a robotic manipulator system, and two logistics modules. The various JEM components will be assembled in space over the course of three Shuttle missions. ch day during the launch period that closes on June 19.
Source link
https://science.ksc.nasa.gov/gallery/photos/2003/
Visits
39
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0