Close-up views Cosmic Radiation Effects and Activation Monitor (CREAM) DC power cables attached to the active monitor (013-4, 026). View of activation foil pack on the aft airlock (015-8, 024) and on the middeck floor (019). Mission specialist Jeff Wisoff (with microphone in hand) reviews the CREAM activation procedures in his checklist (020, 022-3). Close-up of CREAM activation checklist (021). Blurred view of Wisoff installing CREAM packet in airlock (025).
Information
Taken in
Space
Author
NASA
Description
Close-up views Cosmic Radiation Effects and Activation Monitor (CREAM) DC power cables attached to the active monitor (013-4, 026). View of activation foil pack on the aft airlock (015-8, 024) and on the middeck floor (019). Mission specialist Jeff Wisoff (with microphone in hand) reviews the CREAM activation procedures in his checklist (020, 022-3). Close-up of CREAM activation checklist (021). Blurred view of Wisoff installing CREAM packet in airlock (025).