sts-84-landing_9459339720_o.jpg KSC-97PC-0844ThumbnailsKSC-97PC-0845KSC-97PC-0844ThumbnailsKSC-97PC-0845
Framed by the Vehicle Assembly Building in the distance, at left, and the Mate- Demate Device, the Space Shuttle Atlantis with its drag chute deployed touches down on Kennedy Space Center's (KSC) Runway 33 at the conclusion of the STS-84 mission. The Shuttle Training Aircraft piloted by Astronaut Kenneth D. Cockrell, acting deputy chief of the Astronaut Office, was flying alongside Atlantis. Main gear touchdown was at 9:27:44 a.m. EDT on May 24, 1997. The first landing opportunity was waved off because of low cloud cover. It was the 37th landing at KSC since the Shuttle program began in 1981, and the eighth consecutive landing at KSC. STS-84 was the sixth of nine planned dockings of the Space Shuttle with the Russian Space Station Mir. Atlantis was docked with the Mir for five days. STS-84 Mission Specialist C. Michael Foale replaced astronaut and Mir 23 crew member Jerry M. Linenger, who has been on the Russian Space Station since January 15. Linenger returned to Earth on Atlantis with the rest of the STS-84 crew, Mission Commander Charles J. Precourt, Pilot Eileen Marie Collins, and Mission Specialists Carlos I. Noriega, Edward Tsang Lu, Elena V. Kondakova of the Russian Space Agency and Jean-Francois Clervoy of the European Space Agency. Foale was scheduled to remain on the Mir for approximately four months. He was replaced by STS-86 crew member David Wolf in September 1997. Besides the docking and crew exchange, STS-84 included the transfer of more than 7,300 pounds of water, logistics and science experiments and hardware to and from the Mir.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
Framed by the Vehicle Assembly Building in the distance, at left, and the Mate- Demate Device, the Space Shuttle Atlantis with its drag chute deployed touches down on Kennedy Space Center's (KSC) Runway 33 at the conclusion of the STS-84 mission. The Shuttle Training Aircraft piloted by Astronaut Kenneth D. Cockrell, acting deputy chief of the Astronaut Office, was flying alongside Atlantis. Main gear touchdown was at 9:27:44 a.m. EDT on May 24, 1997. The first landing opportunity was waved off because of low cloud cover. It was the 37th landing at KSC since the Shuttle program began in 1981, and the eighth consecutive landing at KSC. STS-84 was the sixth of nine planned dockings of the Space Shuttle with the Russian Space Station Mir. Atlantis was docked with the Mir for five days. STS-84 Mission Specialist C. Michael Foale replaced astronaut and Mir 23 crew member Jerry M. Linenger, who has been on the Russian Space Station since January 15. Linenger returned to Earth on Atlantis with the rest of the STS-84 crew, Mission Commander Charles J. Precourt, Pilot Eileen Marie Collins, and Mission Specialists Carlos I. Noriega, Edward Tsang Lu, Elena V. Kondakova of the Russian Space Agency and Jean-Francois Clervoy of the European Space Agency. Foale was scheduled to remain on the Mir for approximately four months. He was replaced by STS-86 crew member David Wolf in September 1997. Besides the docking and crew exchange, STS-84 included the transfer of more than 7,300 pounds of water, logistics and science experiments and hardware to and from the Mir.
Source link
https://www.flickr.com/photos/nasacommons/albums/72157650752851752
Visits
62
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
Public Domain
Modified by WikiArchives
No (original)
Downloads
0
EXIF Metadata
DateTimeOriginal
1997:05:24 00:00:00