(1967) The S-II stage of the Saturn V rocket is hoisted onto the A-2 test stand in 1967 at the Mississippi Test Facility, now the Stennis Space Center. This was the second stage of the 364-foot tall Moon rocket. The second stage was powered by five J-2 engines.
Information
Taken in
Other
Author
NASA
Description
(1967) The S-II stage of the Saturn V rocket is hoisted onto the A-2 test stand in 1967 at the Mississippi Test Facility, now the Stennis Space Center. This was the second stage of the 364-foot tall Moon rocket. The second stage was powered by five J-2 engines.