KSC-05PD-0362.jpg KSC-05PD-0361ThumbnailsKSC-05PD-0363KSC-05PD-0361ThumbnailsKSC-05PD-0363
In Firing Room 1 at KSC, Shuttle launch team members put the Shuttle system through an End-to-End (ETE) Mission Management Team (MMT) launch simulation. The control room is set up with software used to simulate flight and ground systems in the launch configuration. The ETE MMT simulation included L-2 and L-1 day Prelaunch MMT meetings, an external tanking/weather briefing, and a launch countdown. The ETE transitioned to the Johnson Space Center for the flight portion of the simulation, with the STS-114 crew in a simulator at JSC. Such simulations are common before a launch to keep the Shuttle launch team sharp and ready for liftoff.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
In Firing Room 1 at KSC, Shuttle launch team members put the Shuttle system through an End-to-End (ETE) Mission Management Team (MMT) launch simulation. The control room is set up with software used to simulate flight and ground systems in the launch configuration. The ETE MMT simulation included L-2 and L-1 day Prelaunch MMT meetings, an external tanking/weather briefing, and a launch countdown. The ETE transitioned to the Johnson Space Center for the flight portion of the simulation, with the STS-114 crew in a simulator at JSC. Such simulations are common before a launch to keep the Shuttle launch team sharp and ready for liftoff.
Source link
https://science.ksc.nasa.gov/gallery/photos/2005/
Visits
39
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
1