KSC-05PD-0068.jpg KSC-05PD-0067ThumbnailsKSC-05PD-0069KSC-05PD-0067ThumbnailsKSC-05PD-0069KSC-05PD-0067ThumbnailsKSC-05PD-0069KSC-05PD-0067ThumbnailsKSC-05PD-0069
In the Remote Manipulator System lab, United Space Alliance technicians Jake Senior and Todd Dugan work on the Orbiter Boom Sensor System. The OBSS is undergoing final checkout and testing in the lab prior to being transferred to the Orbiter Processing Facility for installation on Space Shuttle Discovery. The 50-foot-long OBSS will be attached to the Remote Manipulator System, or Shuttle arm, and is one of the new safety measures for Return to Flight, equipping the orbiter with cameras and laser systems to inspect the Shuttle's Thermal Protection System while in space. Discovery is slated to fly mission STS-114 once Space Shuttle launches resume. The launch planning window is May 12 to June 3, 2005.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
In the Remote Manipulator System lab, United Space Alliance technicians Jake Senior and Todd Dugan work on the Orbiter Boom Sensor System. The OBSS is undergoing final checkout and testing in the lab prior to being transferred to the Orbiter Processing Facility for installation on Space Shuttle Discovery. The 50-foot-long OBSS will be attached to the Remote Manipulator System, or Shuttle arm, and is one of the new safety measures for Return to Flight, equipping the orbiter with cameras and laser systems to inspect the Shuttle's Thermal Protection System while in space. Discovery is slated to fly mission STS-114 once Space Shuttle launches resume. The launch planning window is May 12 to June 3, 2005.
Source link
https://science.ksc.nasa.gov/gallery/photos/2005/
Visits
68
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0