KSC-05PD-0327.jpg KSC-05PD-0326ThumbnailsKSC-05PD-0328KSC-05PD-0326ThumbnailsKSC-05PD-0328KSC-05PD-0326ThumbnailsKSC-05PD-0328KSC-05PD-0326ThumbnailsKSC-05PD-0328
Technicians work on a Solid Rocket Booster (SRB) slated for use on the STS-114 mission in the Vehicle Assembly Building. Repairs are under way on the Solid Rocket Booster aft inactive stub, an attach ring surrounding the booster located approximately 10 feet below the point where the External Tank is mated to the SRBs. Return to Flight Mission STS-114 will carry the Multi-Purpose Logistics Module Raffaello, filled with supplies for the International Space Station, and a replacement Control Moment Gyroscope. Launch of STS-114 has a launch window of May 15 to June 3.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
Technicians work on a Solid Rocket Booster (SRB) slated for use on the STS-114 mission in the Vehicle Assembly Building. Repairs are under way on the Solid Rocket Booster aft inactive stub, an attach ring surrounding the booster located approximately 10 feet below the point where the External Tank is mated to the SRBs. Return to Flight Mission STS-114 will carry the Multi-Purpose Logistics Module Raffaello, filled with supplies for the International Space Station, and a replacement Control Moment Gyroscope. Launch of STS-114 has a launch window of May 15 to June 3.
Source link
https://science.ksc.nasa.gov/gallery/photos/2005/
Visits
66
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0