KSC-05PD-1324.jpg KSC-05PD-1323ThumbnailsKSC-05PD-1325KSC-05PD-1323ThumbnailsKSC-05PD-1325KSC-05PD-1323ThumbnailsKSC-05PD-1325KSC-05PD-1323ThumbnailsKSC-05PD-1325
Space Shuttle Discovery, on top of the Mobile Launcher Platform and Crawler-Transporter, makes its way along the crawlerway to Launch Pad 39B. Getting a close look at the operation is Center Director Jim Kennedy (second from right), flanked by (on the left) Prentice Washington, intern for Deputy Director Woodrow Whitlow Jr., and Associate Director Jim Hattaway, and (on the right) Hortense Burt, intern for Kennedy. This is the second rollout of Discovery after being returned to the Vehicle Assembly Building for connection to an improved External Tank. Launch of Discovery on its Return to Flight mission STS-114 is targeted for a launch window extending from July 13 to July 31.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
Space Shuttle Discovery, on top of the Mobile Launcher Platform and Crawler-Transporter, makes its way along the crawlerway to Launch Pad 39B. Getting a close look at the operation is Center Director Jim Kennedy (second from right), flanked by (on the left) Prentice Washington, intern for Deputy Director Woodrow Whitlow Jr., and Associate Director Jim Hattaway, and (on the right) Hortense Burt, intern for Kennedy. This is the second rollout of Discovery after being returned to the Vehicle Assembly Building for connection to an improved External Tank. Launch of Discovery on its Return to Flight mission STS-114 is targeted for a launch window extending from July 13 to July 31.
Source link
https://science.ksc.nasa.gov/gallery/photos/2005/
Visits
58
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0