KSC-05PD-0172.jpg KSC-05PD-0171ThumbnailsKSC-05PD-0173KSC-05PD-0171ThumbnailsKSC-05PD-0173KSC-05PD-0171ThumbnailsKSC-05PD-0173KSC-05PD-0171ThumbnailsKSC-05PD-0173
In the Orbiter Processing Facility high bay, technicians check the crane that will lift the Orbiter Boom Sensor System (OBSS) from its transporter. The OBSS will be installed on the starboard side of the payload bay in the orbiter Discovery. The 50-foot-long OBSS attaches to the Remote Manipulator System, or Shuttle robotic arm, and is one of the new safety measures for Return to Flight, equipping the orbiter with cameras and laser systems to inspect the Shuttles Thermal Protection System while in space. The Return to Flight mission, STS-114, has a launch window of May 12 to June 3, 2005.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
In the Orbiter Processing Facility high bay, technicians check the crane that will lift the Orbiter Boom Sensor System (OBSS) from its transporter. The OBSS will be installed on the starboard side of the payload bay in the orbiter Discovery. The 50-foot-long OBSS attaches to the Remote Manipulator System, or Shuttle robotic arm, and is one of the new safety measures for Return to Flight, equipping the orbiter with cameras and laser systems to inspect the Shuttles Thermal Protection System while in space. The Return to Flight mission, STS-114, has a launch window of May 12 to June 3, 2005.
Source link
https://science.ksc.nasa.gov/gallery/photos/2005/
Visits
67
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
1