KSC-05PD-0350.jpg KSC-05PD-0349ThumbnailsKSC-05PD-0351KSC-05PD-0349ThumbnailsKSC-05PD-0351KSC-05PD-0349ThumbnailsKSC-05PD-0351KSC-05PD-0349ThumbnailsKSC-05PD-0351
Inside the Vehicle Assembly Building, the External Tank (ET) designated for the Return to Flight mission STS-114 nears its position between the Solid Rocket Boosters (SRBs) on the Mobile Launcher Platform. The ET will be mated to the SRBs for launch. The 154-foot long ET is recently redesigned to meet recommendations of the Columbia Accident Investigation Board before returning to flight. Among dozens of changes is a redesigned forward bipod fitting to reduce the risk to the Space Shuttle from falling debris during ascent. Considered a test flight, STS-114 is scheduled to launch during a window extending May 15 to June 3. The Shuttle will carry supplies and equipment to the International Space Station.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
Inside the Vehicle Assembly Building, the External Tank (ET) designated for the Return to Flight mission STS-114 nears its position between the Solid Rocket Boosters (SRBs) on the Mobile Launcher Platform. The ET will be mated to the SRBs for launch. The 154-foot long ET is recently redesigned to meet recommendations of the Columbia Accident Investigation Board before returning to flight. Among dozens of changes is a redesigned forward bipod fitting to reduce the risk to the Space Shuttle from falling debris during ascent. Considered a test flight, STS-114 is scheduled to launch during a window extending May 15 to June 3. The Shuttle will carry supplies and equipment to the International Space Station.
Source link
https://science.ksc.nasa.gov/gallery/photos/2005/
Visits
65
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0