KSC-05PD-1297.jpg KSC-05PD-1296ThumbnailsKSC-05PD-1298KSC-05PD-1296ThumbnailsKSC-05PD-1298KSC-05PD-1296ThumbnailsKSC-05PD-1298KSC-05PD-1296ThumbnailsKSC-05PD-1298
Lights inside the Vehicle Assembly Building cast an orange glow on Space Shuttle Discovery as waits on top of the Mobile Launcher Platform for rollout to Launch Pad 39B. Rollout is expected to begin about 12:01 a.m. June 15 for the 4-mile, 6-hour trip to the pad. On either side of Discoverys tail and Orbiter Maneuvering System Pods are the Tail Masts that support the fluid, gas and electrical requirements of the orbiters liquid oxygen and liquid hydrogen aft T-0 umbilicals. Space Shuttle Discovery's Return to Flight mission STS-114 is scheduled for liftoff in a window extending from July 13 to July 31.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
Lights inside the Vehicle Assembly Building cast an orange glow on Space Shuttle Discovery as waits on top of the Mobile Launcher Platform for rollout to Launch Pad 39B. Rollout is expected to begin about 12:01 a.m. June 15 for the 4-mile, 6-hour trip to the pad. On either side of Discoverys tail and Orbiter Maneuvering System Pods are the Tail Masts that support the fluid, gas and electrical requirements of the orbiters liquid oxygen and liquid hydrogen aft T-0 umbilicals. Space Shuttle Discovery's Return to Flight mission STS-114 is scheduled for liftoff in a window extending from July 13 to July 31.
Source link
https://science.ksc.nasa.gov/gallery/photos/2005/
Visits
27
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
1