KSC-05PD-0511.jpg KSC-05PD-0510ThumbnailsKSC-05PD-0512KSC-05PD-0510ThumbnailsKSC-05PD-0512KSC-05PD-0510ThumbnailsKSC-05PD-0512KSC-05PD-0510ThumbnailsKSC-05PD-0512
At NASAs Kennedy Space Center, media capture the image of the orbiter Discovery as it is suspended vertically from an overhead crane in the transfer aisle of the Vehicle Assembly Building. Discovery will be lifted up and lowered to the Solid Rocket Booster and External Tank already stacked on the top of the Mobile Launcher Platform (MLP). After Discovery has been mated to the External Tank/Solid Rocket Booster assembly on the MLP and all umbilicals have been connected, workers will perform an electrical and mechanical verification of the mated interfaces to verify all critical vehicle connections. A Shuttle interface test is performed using the launch processing system to verify Space Shuttle vehicle interfaces and Space Shuttle vehicle-to-ground interfaces. In approximately one week, Space Shuttle Discovery will be ready for rollout to Launch Pad 39B for Return to Flight mission STS-114. The launch window for STS-114 is May 15 to June 3.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
At NASAs Kennedy Space Center, media capture the image of the orbiter Discovery as it is suspended vertically from an overhead crane in the transfer aisle of the Vehicle Assembly Building. Discovery will be lifted up and lowered to the Solid Rocket Booster and External Tank already stacked on the top of the Mobile Launcher Platform (MLP). After Discovery has been mated to the External Tank/Solid Rocket Booster assembly on the MLP and all umbilicals have been connected, workers will perform an electrical and mechanical verification of the mated interfaces to verify all critical vehicle connections. A Shuttle interface test is performed using the launch processing system to verify Space Shuttle vehicle interfaces and Space Shuttle vehicle-to-ground interfaces. In approximately one week, Space Shuttle Discovery will be ready for rollout to Launch Pad 39B for Return to Flight mission STS-114. The launch window for STS-114 is May 15 to June 3.
Source link
https://science.ksc.nasa.gov/gallery/photos/2005/
Visits
89
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0